TITLE II—Next Generation Air Transportation System and Air Traffic Control Modernization

SEC. 201. Mission statement; sense of Congress.

(a) Findings.—Congress finds the following:

(1) The United States faces a great national challenge as the Nation’s aviation infrastructure is at a crossroads.

(2) The demand for aviation services, a critical element of the United States economy, vital in supporting the quality of life of the people of the United States, and critical in support of the Nation’s defense and national security, is growing at an ever increasing rate. At the same time, the ability of the United States air transportation system to expand and change to meet this increasing demand is limited.

(3) The aviation industry accounts for more than 11,000,000 jobs in the United States and contributes approximately $741,000,000,000 annually to the United States gross domestic product.

(4) The United States air transportation system continues to drive economic growth in the United States and will continue to be a major economic driver as air traffic triples over the next 20 years.

(5) The Next Generation Air Transportation System (in this section referred to as the “NextGen System”) is the system for achieving long-term transformation of the United States air transportation system that focuses on developing and implementing new technologies and that will set the stage for the long-term development of a scalable and more flexible air transportation system without compromising the unprecedented safety record of United States aviation.

(6) The benefits of the NextGen System, in terms of promoting economic growth and development, are enormous.

(7) The NextGen System will guide the path of the United States air transportation system in the challenging years ahead.

(b) Sense of congress.—It is the sense of Congress that—

(1) modernizing the air transportation system is a national priority and the United States must make a commitment to revitalizing this essential component of the Nation’s transportation infrastructure;

(2) one fundamental requirement for the success of the NextGen System is strong leadership and sufficient resources;

(3) the Joint Planning and Development Office of the Federal Aviation Administration and the Next Generation Air Transportation System Senior Policy Committee, each established by Congress in 2003, will lead and facilitate this important national mission to ensure that the programs and capabilities of the NextGen System are carefully integrated and aligned;

(4) Government agencies and industry must work together, carefully integrating and aligning their work to meet the needs of the NextGen System in the development of budgets, programs, planning, and research;

(5) the Department of Transportation, the Federal Aviation Administration, the Department of Defense, the Department of Homeland Security, the Department of Commerce, and the National Aeronautics and Space Administration must work in cooperation and make transformational improvements to the United States air transportation infrastructure a priority; and

(6) due to the critical importance of the NextGen System to the economic and national security of the United States, partner departments and agencies must be provided with the resources required to complete the implementation of the NextGen System.

SEC. 202. Next Generation Air Transportation System Joint Planning and Development Office.

(a) Establishment.—

(1) Associate Administrator for the Next Generation Air Transportation System.—Section 709(a) of Vision 100—Century of Aviation Reauthorization Act (49 U.S.C. 40101 note; 117 Stat. 2582) is amended—

(A) by redesignating paragraphs (2), (3), and (4) as paragraphs (3), (4), and (5), respectively; and

(B) by inserting after paragraph (1) the following:

“(2) The director of the Office shall be the Associate Administrator for the Next Generation Air Transportation System, who shall be appointed by the Administrator of the Federal Aviation Administration. The Associate Administrator shall report to the Administrator.”.

(2) Responsibilities.—Section 709(a)(3) of such Act (as redesignated by paragraph (1) of this subsection) is amended—

(A) in subparagraph (G) by striking “; and” and inserting a semicolon;

(B) in subparagraph (H) by striking the period at the end and inserting “; and”; and

(C) by adding at the end the following:

“(I) establishing specific quantitative goals for the safety, capacity, efficiency, performance, and environmental impacts of each phase of Next Generation Air Transportation System implementation activities and measuring actual operational experience against those goals, taking into account noise pollution reduction concerns of affected communities to the greatest extent practicable in establishing the environmental goals;

“(J) working to ensure global interoperability of the Next Generation Air Transportation System;

“(K) working to ensure the use of weather information and space weather information in the Next Generation Air Transportation System as soon as possible;

“(L) overseeing, with the Administrator of the Federal Aviation Administration, the selection of products or outcomes of research and development activities that would be moved to the next stage of a demonstration project; and

“(M) maintaining a baseline modeling and simulation environment for testing and evaluating alternative concepts to satisfy Next Generation Air Transportation enterprise architecture requirements.”.

(3) Cooperation with other Federal agencies.—Section 709(a)(4) of such Act (as redesignated by paragraph (1) of this subsection) is amended—

(A) by striking “(4)” and inserting “(4)(A)”; and

(B) by adding at the end the following:

“(B) The Secretary of Defense, the Administrator of the National Aeronautics and Space Administration, the Secretary of Commerce, the Secretary of Homeland Security, and the head of any other Federal agency from which the Secretary of Transportation requests assistance under subparagraph (A) shall designate a senior official in the agency to be responsible for—

“(i) carrying out the activities of the agency relating to the Next Generation Air Transportation System in coordination with the Office, including the execution of all aspects of the work of the agency in developing and implementing the integrated work plan described in subsection (b)(5);

“(ii) serving as a liaison for the agency in activities of the agency relating to the Next Generation Air Transportation System and coordinating with other Federal agencies involved in activities relating to the System; and

“(iii) ensuring that the agency meets its obligations as set forth in any memorandum of understanding executed by or on behalf of the agency relating to the Next Generation Air Transportation System.

“(C) The head of a Federal agency referred to in subparagraph (B) shall ensure that—

“(i) the responsibilities of the agency relating to the Next Generation Air Transportation System are clearly communicated to the senior official of the agency designated under subparagraph (B); and

“(ii) the performance of the senior official in carrying out the responsibilities of the agency relating to the Next Generation Air Transportation System is reflected in the official’s annual performance evaluations and compensation.

“(D) The head of a Federal agency referred to in subparagraph (B) shall—

“(i) establish or designate an office within the agency to carry out its responsibilities under the memorandum of understanding under the supervision of the designated official; and

“(ii) ensure that the designated official has sufficient budgetary authority and staff resources to carry out the agency’s Next Generation Air Transportation System responsibilities as set forth in the integrated plan under subsection (b).

“(E) Not later than 6 months after the date of enactment of this subparagraph, the head of each Federal agency that has responsibility for carrying out any activity under the integrated plan under subsection (b) shall execute a memorandum of understanding with the Office obligating that agency to carry out the activity.”.

(4) Coordination with OMB.—Section 709(a) of such Act (117 Stat. 2582) is further amended by adding at the end the following:

“(6)(A) The Office shall work with the Director of the Office of Management and Budget to develop a process whereby the Director will identify projects related to the Next Generation Air Transportation System across the agencies referred to in paragraph (4)(A) and consider the Next Generation Air Transportation System as a unified, cross-agency program.

“(B) The Director, to the maximum extent practicable, shall—

“(i) ensure that—

“(I) each Federal agency covered by the plan has sufficient funds requested in the President’s budget, as submitted under section 1105(a) of title 31, United States Code, for each fiscal year covered by the plan to carry out its responsibilities under the plan; and

“(II) the development and implementation of the Next Generation Air Transportation System remains on schedule;

“(ii) include, in the President’s budget, a statement of the portion of the estimated budget of each Federal agency covered by the plan that relates to the activities of the agency under the Next Generation Air Transportation System initiative; and

“(iii) identify and justify as part of the President’s budget submission any inconsistencies between the plan and amounts requested in the budget.

“(7) The Associate Administrator of the Next Generation Air Transportation System shall be a voting member of the Joint Resources Council of the Federal Aviation Administration.”.

(b) Integrated plan.—Section 709(b) of such Act (117 Stat. 2583) is amended—

(1) in the matter preceding paragraph (1)—

(A) by striking “meets air” and inserting “meets anticipated future air”; and

(B) by striking “beyond those currently included in the Federal Aviation Administration’s operational evolution plan”;

(2) by striking “and” at the end of paragraph (3);

(3) by striking the period at the end of paragraph (4) and inserting “; and”; and

(4) by adding at the end the following:

“(5) a multiagency integrated work plan for the Next Generation Air Transportation System that includes—

“(A) an outline of the activities required to achieve the end-state architecture, as expressed in the concept of operations and enterprise architecture documents, that identifies each Federal agency or other entity responsible for each activity in the outline;

“(B) details on a year-by-year basis of specific accomplishments, activities, research requirements, rulemakings, policy decisions, and other milestones of progress for each Federal agency or entity conducting activities relating to the Next Generation Air Transportation System;

“(C) for each element of the Next Generation Air Transportation System, an outline, on a year-by-year basis, of what is to be accomplished in that year toward meeting the Next Generation Air Transportation System’s end-state architecture, as expressed in the concept of operations and enterprise architecture documents, as well as identifying each Federal agency or other entity that will be responsible for each component of any research, development, or implementation program;

“(D) an estimate of all necessary expenditures on a year-by-year basis, including a statement of each Federal agency or entity’s responsibility for costs and available resources, for each stage of development from the basic research stage through the demonstration and implementation phase;

“(E) a clear explanation of how each step in the development of the Next Generation Air Transportation System will lead to the following step and of the implications of not successfully completing a step in the time period described in the integrated work plan;

“(F) a transition plan for the implementation of the Next Generation Air Transportation System that includes date-specific milestones for the implementation of new capabilities into the national airspace system; and

“(G) date-specific timetables for meeting the environmental goals identified in subsection (a)(3)(I).”.

(c) NextGen implementation plan.—Section 709(d) of such Act (117 Stat. 2584) is amended to read as follows:

“(d) NextGen implementation plan.—The Administrator of the Federal Aviation Administration shall develop and publish annually the document known as the ‘NextGen Implementation Plan’, or any successor document, that provides a detailed description of how the agency is implementing the Next Generation Air Transportation System.”.

(d) Authorization of appropriations.—Section 709(e) of such Act (117 Stat. 2584) is amended by striking “2010” and inserting “2012”.

(e) Contingency planning.—The Associate Administrator for the Next Generation Air Transportation System shall, as part of the design of the System, develop contingency plans for dealing with the degradation of the System in the event of a natural disaster, major equipment failure, or act of terrorism.

SEC. 203. Next Generation Air Transportation Senior Policy Committee.

(a) Meetings.—Section 710(a) of Vision 100—Century of Aviation Reauthorization Act (49 U.S.C. 40101 note; 117 Stat. 2584) is amended by inserting before the period at the end the following “and shall meet at least twice each year”.

(b) Annual report.—Section 710 of such Act (117 Stat. 2584) is amended by adding at the end the following:

“(e) Annual report.—

“(1) Submission to Congress.—Not later than one year after the date of enactment of this subsection, and annually thereafter on the date of submission of the President’s budget request to Congress under section 1105(a) of title 31, United States Code, the Secretary shall submit to the Committee on Transportation and Infrastructure and the Committee on Science and Technology of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate a report summarizing the progress made in carrying out the integrated work plan required by section 709(b)(5) and any changes in that plan.

“(2) Contents.—The report shall include—

“(A) a copy of the updated integrated work plan;

“(B) a description of the progress made in carrying out the integrated work plan and any changes in that plan, including any changes based on funding shortfalls and limitations set by the Office of Management and Budget;

“(C) a detailed description of—

“(i) the success or failure of each item of the integrated work plan for the previous year and relevant information as to why any milestone was not met; and

“(ii) the impact of not meeting the milestone and what actions will be taken in the future to account for the failure to complete the milestone;

“(D) an explanation of any change to future years in the integrated work plan and the reasons for such change; and

“(E) an identification of the levels of funding for each agency participating in the integrated work plan devoted to programs and activities under the plan for the previous fiscal year and in the President’s budget request.”.

SEC. 204. Automatic dependent surveillance-broadcast services.

(a) Report on FAA program and schedule.—

(1) In general.—The Administrator of the Federal Aviation Administration shall prepare a report detailing the program and schedule for integrating automatic dependent surveillance-broadcast (in this section referred to as “ADS-B”) technology into the national airspace system.

(2) Contents.—The report shall include—

(A) a description of segment 1 and segment 2 activity to acquire ADS-B services;

(B) a description of plans for implementation of advanced operational procedures and ADS-B air-to-air applications; and

(C) a discussion of protections that the Administration will require as part of any contract or program in the event of a contractor’s default, bankruptcy, acquisition by another entity, or any other event jeopardizing the uninterrupted provision of ADS-B services.

(3) Submission to Congress.—Not later than 90 days after the date of enactment of this Act, the Administrator shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate the report prepared under paragraph (1).

(b) Requirements of FAA contracts for ADS-B services.—Any contract entered into by the Administrator with an entity to acquire ADS-B services shall contain terms and conditions that—

(1) require approval by the Administrator before the contract may be assigned to or assumed by another entity, including any successor entity, subsidiary of the contractor, or other corporate entity;

(2) provide that the assets, equipment, hardware, and software used in the performance of the contract be designated as critical national infrastructure for national security and related purposes;

(3) require the contractor to provide continued broadcast services for a reasonable period, as determined by the Administrator, until the provision of such services can be transferred to another vendor or to the Government in the event of a termination of the contract;

(4) require the contractor to provide continued broadcast services for a reasonable period, as determined by the Administrator, until the provision of such services can be transferred to another vendor or to the Government in the event of material nonperformance, as determined by the Administrator; and

(5) permit the Government to acquire or utilize for a reasonable period, as determined by the Administrator, the assets, equipment, hardware, and software necessary to ensure the continued and uninterrupted provision of ADS-B services and to have ready access to such assets, equipment, hardware, and software through its own personnel, agents, or others, if the Administrator provides reasonable compensation for such acquisition or utilization.

(c) Review by DOT inspector general.—

(1) In general.—The Inspector General of the Department of Transportation shall conduct a review concerning the Federal Aviation Administration’s award and oversight of any contract entered into by the Administration to provide ADS-B services for the national airspace system.

(2) Contents.—The review shall include, at a minimum—

(A) an examination of how program risks are being managed;

(B) an assessment of expected benefits attributable to the deployment of ADS-B services, including the implementation of advanced operational procedures and air-to-air applications as well as to the extent to which ground radar will be retained;

(C) a determination of whether the Administration has established sufficient mechanisms to ensure that all design, acquisition, operation, and maintenance requirements have been met by the contractor;

(D) an assessment of whether the Administration and any contractors are meeting cost, schedule, and performance milestones, as measured against the original baseline of the Administration’s program for providing ADS-B services;

(E) an assessment of whether security issues are being adequately addressed in the overall design and implementation of the ADS-B system; and

(F) any other matters or aspects relating to contract implementation and oversight that the Inspector General determines merit attention.

(3) Reports to Congress.—The Inspector General shall periodically, on at least an annual basis, submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate a report on the results of the review conducted under this subsection.

SEC. 205. Inclusion of stakeholders in air traffic control modernization projects.

(a) In general.—The Administrator of the Federal Aviation Administration shall establish a process for including in the planning, development, and deployment of air traffic control modernization projects (including the Next Generation Air Transportation System) and collaborating with qualified employees selected by each exclusive collective bargaining representative of employees of the Administration who are likely to be impacted by such planning, development, and deployment.

(b) Participation.—

(1) Bargaining obligations and rights.—Participation in the process described in subsection (a) shall not be construed as a waiver of any bargaining obligations or rights under section 40122(a)(1) or 40122(g)(2)(C) of title 49, United States Code.

(2) Capacity and compensation.—Exclusive collective bargaining representatives and selected employees participating in the process described in subsection (a) shall—

(A) serve in a collaborative and advisory capacity; and

(B) receive appropriate travel and per diem expenses in accordance with the travel policies of the Administration in addition to any regular compensation and benefits.

(c) Report.—Not later than 180 days after the date of enactment of this Act, the Administrator shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate a report on the implementation of this section.

SEC. 206. GAO review of challenges associated with transforming to the Next Generation Air Transportation System.

(a) In general.—The Comptroller General shall conduct a review of the progress and challenges associated with transforming the Nation’s air traffic control system into the Next Generation Air Transportation System (in this section referred to as the “NextGen System”).

(b) Review.—The review shall include the following:

(1) An evaluation of the continued implementation and institutionalization of the processes that are key to the ability of the Air Traffic Organization to effectively maintain management structures and systems acquisitions procedures utilized under the current air traffic control modernization program as a basis for the NextGen System.

(2) An assessment of the progress and challenges associated with collaboration and contributions of the partner agencies working with the Joint Planning and Development Office of the Federal Aviation Administration (in this section referred to as the “JPDO”) in planning and implementing the NextGen System.

(3) The progress and challenges associated with coordinating government and industry stakeholders in activities relating to the NextGen System, including an assessment of the contributions of the NextGen Institute.

(4) An assessment of planning and implementation of the NextGen System against established schedules, milestones, and budgets.

(5) An evaluation of the recently modified organizational structure of the JPDO.

(6) An examination of transition planning by the Air Traffic Organization and the JPDO.

(7) Any other matters or aspects of planning and coordination of the NextGen System by the Federal Aviation Administration and the JPDO that the Comptroller General determines appropriate.

(c) Reports.—

(1) Report to Congress on priorities.—Not later than one year after the date of enactment of this Act, the Comptroller General shall determine the priority of topics to be reviewed under this section and report such priorities to the Committee on Transportation and Infrastructure and the Committee on Science and Technology of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate.

(2) Periodic reports to Congress on results of the review.—The Comptroller General shall periodically submit to the committees referred to in paragraph (1) a report on the results of the review conducted under this section.

SEC. 207. GAO review of Next Generation Air Transportation System acquisition and procedures development.

(a) Study.—The Comptroller General shall conduct a review of the progress made and challenges related to the acquisition of designated technologies and the development of procedures for the Next Generation Air Transportation System (in this section referred to as the “NextGen System”).

(b) Specific systems review.—The review shall include, at a minimum, an examination of the acquisition costs, schedule, and other relevant considerations for the following systems:

(1) En Route Automation Modernization (ERAM).

(2) Standard Terminal Automation Replacement System/Common Automated Radar Terminal System (STARS/CARTS).

(3) Automatic Dependent Surveillance-Broadcast (ADS-B).

(4) System Wide Information Management (SWIM).

(5) Traffic Flow Management Modernization (TFM-M).

(c) Review.—The review shall include, at a minimum, an assessment of the progress and challenges related to the development of standards, regulations, and procedures that will be necessary to implement the NextGen System, including required navigation performance, area navigation, the airspace management program, and other programs and procedures that the Comptroller General identifies as relevant to the transformation of the air traffic system.

(d) Periodic reports to Congress on results of the review.—The Comptroller General shall periodically submit to the Committee on Transportation and Infrastructure and the Committee on Science and Technology of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate a report on the results of the review conducted under this section.

SEC. 208. DOT inspector general review of operational and approach procedures by a third party.

(a) Review.—The Inspector General of the Department of Transportation shall conduct a review regarding the effectiveness of the oversight activities conducted by the Federal Aviation Administration in connection with any agreement with or delegation of authority to a third party for the development of flight procedures for the national airspace system.

(b) Assessments.—The Inspector General shall include, at a minimum, in the review—

(1) an assessment of the extent to which the Federal Aviation Administration is relying or intends to rely on a third party for the development of new procedures and a determination of whether the Administration has established sufficient mechanisms and staffing to provide safety oversight of a third party; and

(2) an assessment regarding whether the Administration has sufficient existing personnel and technical resources or mechanisms to develop such flight procedures in a safe and efficient manner to meet the demands of the national airspace system without the use of third party resources.

(c) Report.—Not later than one year after the date of enactment of this Act, the Inspector General shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate a report on the results of the review conducted under this section, including the assessments described in subsection (b).

SEC. 209. Expert review of enterprise architecture for Next Generation Air Transportation System.

(a) Review.—The Administrator of the Federal Aviation Administration shall enter into an arrangement with the National Research Council to review the enterprise architecture for the Next Generation Air Transportation System.

(b) Contents.—At a minimum, the review to be conducted under subsection (a) shall—

(1) highlight the technical activities, including human-system design, organizational design, and other safety and human factor aspects of the system, that will be necessary to successfully transition current and planned modernization programs to the future system envisioned by the Joint Planning and Development Office of the Administration;

(2) assess technical, cost, and schedule risk for the software development that will be necessary to achieve the expected benefits from a highly automated air traffic management system and the implications for ongoing modernization projects; and

(3) include judgments on how risks with automation efforts for the Next Generation Air Transportation System can be mitigated based on the experiences of other public or private entities in developing complex, software-intensive systems.

(c) Report.—Not later than one year after the date of enactment of this Act, the Administrator shall submit to Congress a report containing the results of the review conducted pursuant to subsection (a).

SEC. 210. NextGen technology testbed.

Of amounts appropriated under section 48101(a) of title 49, United States Code, the Administrator of the Federal Aviation Administration shall use such sums as may be necessary for each of the fiscal years 2009 through 2012 to contribute to the establishment by a public-private partnership (including a university component with significant aviation expertise in air traffic management, simulation, meteorology, and engineering and aviation business) an airport-based testing site for existing Next Generation Air Transport System technologies. The Administrator shall ensure that next generation air traffic control integrated systems developed by private industries are installed at the site for demonstration, operational research, and evaluation by the Administration. The testing site shall serve a mix of general aviation and commercial traffic.

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s